Mandatory
MandatoryDie CastingInjection Molding
CBAM definitive period started 2026-01-01: most steel/aluminum die cast parts are CBAM goods
European Commission · Regulation (EU) 2023/956 · 2023-05-16
- CBAM covers steel, aluminum, cement, fertilizer, electricity, and hydrogen imported into the EU.
- Most die cast parts made of steel or aluminum fall under CBAM goods (HS codes 7326, 7616).
- EU importers must purchase CBAM certificates for embedded emissions starting 2026.
- 2026-05 onward: third-party verified carbon data required for molds/die cast parts/stamped parts, traceable by product batch.
View Official Source ↗
MandatoryInjection MoldingDie Casting
ESPR effective 2026-06-01: injection/die cast equipment entering EU needs full lifecycle carbon footprint
European Commission · Regulation (EU) 2024/1781 · 2024-06-13
- ESPR requires products placed on the EU market to meet eco-design requirements including carbon footprint.
- Injection molding and die casting equipment entering the EU need full lifecycle carbon footprint + material recyclability declaration.
- Without compliance, CE certification and customs clearance are blocked.
- Product carbon footprint is a listed parameter that can be imposed under ESPR delegated acts.
View Official Source ↗
MandatoryToys
Battery-containing toys exporting to EU have clear deadlines: battery passport 2027-02-18, LMT carbon footprint 2028-08-18
European Commission · Regulation (EU) 2023/1542 · 2023-07-12
- Battery passport required from 2027-02-18 for batteries placed on the EU market.
- Carbon footprint declaration for LMT (light means of transport) batteries from 2028-08-18.
- Toys containing batteries are directly affected if exported to the EU.
- This is more directly relevant to toy factories than CBAM.
View Official Source ↗
MandatoryDie CastingInjection MoldingToys
CSRD sustainability reporting (Germany): scope narrowed to >1,000 employees + €450M revenue; SMEs pulled in only via customer data requests
European Commission / German Federal Government (CSRD-Umsetzungsgesetz pending) · Directive (EU) 2022/2464 as amended by Directive (EU) 2025/794 · 2025-04-16
- The 'Stop-the-clock' Directive (EU) 2025/794 narrowed CSRD scope to companies with more than 1,000 employees AND over €450M net turnover (wave 2 from FY 2027); listed SMEs fell out of scope entirely.
- Germany transposes CSRD through an amendment to the HGB (§§ 264d, 264a, 267 HGB); the CSRD-Umsetzungsgesetz (government draft 2025-09-03) is still in the Bundestag as of 2026-10, so apply the thresholds as amended by Directive (EU) 2025/794.
- A German die casting / injection SME almost certainly does NOT report under CSRD directly — but its OEM customers who DO report will request Scope 1/2/3 and product carbon data from the supply chain (the 'trickle-down effect' confirmed in the Bundestag committee hearing of 2026-04-13).
- ESRS E1 requires Scope 1, 2 and 3 figures from reporting companies — supplier-provided actual data replaces estimates, which is exactly what a monthly carbon ledger delivers.
View Official Source ↗
MandatoryDie CastingInjection MoldingToys
German national emissions trading (BEHG): CO2 cost on natural gas, diesel and heating oil — €55–65/t corridor in 2026 and 2027
German Federal Government (BEHG) / DEHSt at Umweltbundesamt · Brennstoffemissionshandelsgesetz (BEHG) · 2019-08-12
- BEHG puts a CO2 price on fossil fuels Germany-wide: melting-furnace natural gas, diesel for forklifts and generators, and heating oil all carry a certificate cost.
- 2026: certificates are auctioned in a legal price corridor of €55–65 per tonne, with a fixed sale price of €68 after the auctions; a 2027 amendment (cabinet decision 2026-08-12) extends the same €55–65 corridor to 2027 instead of a free market price.
- You do not buy certificates yourself — your fuel supplier does (§§ 4, 10 BEHG) — but the cost appears on your gas and diesel invoices, which is why stripping it correctly from your bill matters for Scope 1 cost analysis.
- For a foundry, natural gas carries roughly €11/MWh of BEHG cost at €55/t (≈1.1 ct/kWh, from the ~0.2 tCO2/MWh gas emission factor) — it is a forecastable line item on the gas bill, not fixed overhead.
View Official Source ↗
MandatoryDie CastingInjection Molding
EnEfG §8: German companies averaging >7.5 GWh/year total final energy use must run a certified energy management system
German Federal Government (EnEfG) / BAFA · Energieeffizienzgesetz (EnEfG), § 8 · 2023-11-18
- If your average total final energy consumption over the last three completed calendar years exceeds 7.5 GWh/year, § 8 EnEfG obliges you to establish and operate an energy management system (ISO 50001) or environmental management system (EMAS) covering at least 90% of consumption.
- Companies that crossed the threshold before 2023-11-17 had to have the system running by 2025-07-18; later entrants get 20 months from the start of the year in which they crossed the threshold.
- The system must additionally document energy flows, process temperatures, waste-heat sources (avoidable and non-avoidable) and measure feasibility of waste-heat recovery — exactly the data a metering-grade carbon ledger already produces.
- A medium German die casting plant (melting furnaces are power-hungry) can cross 7.5 GWh with 6–8 melting furnaces — check your three-year average, this obligation is more common in the sector than assumed.
View Official Source ↗
MandatoryDie CastingInjection Molding
EDL-G: every non-SME in Germany must redo a DIN EN 16247-1 energy audit every four years
German Federal Government (EDL-G) / BAFA · Gesetz über Energiedienstleistungen und andere Energieeffizienzmaßnahmen (EDL-G), § 8 · 2015-04-21
- All companies that are NOT an SME under the EU definition (>250 employees, or >€50M turnover and >€43M balance sheet) must run an energy audit to DIN EN 16247-1 at least every four years, regardless of sector.
- Exempt if you run a certified ISO 50001 or EMAS system covering at least 90% of total energy consumption — this is why many German manufacturers run an EMS even when EnEfG does not bite.
- A de-minimis rule applies below 500,000 kWh/year total consumption (declare the threshold instead of a full audit).
- The audit results must be filed in BAFA's online portal within two months of the audit report — and the audit's energy balance must reconcile with your billing data, so a monthly consumption ledger is the cleanest evidence base.
View Official Source ↗
MandatoryDie CastingInjection MoldingToys
EU ETS: carbon pricing already operating, power and industry sectors covered
European Commission · Directive 2003/87/EC · 2003-10-13
- EU ETS is the world's largest carbon market, operating since 2005.
- Covers power generation, energy-intensive industry, and aviation within the EU.
- CBAM is designed to prevent carbon leakage from EU ETS-covered industries.
- EUA (Emission Allowance) prices are published quarterly by the European Commission.
View Official Source ↗